http://civilustaad.blogspot.com/
SOLDIER
PILES AND LAGGING
Soldier piles and
lagging is a ground retention method that retains soil, by vertical steel piles
with horizontal lagging. Characteristically, H-piles are drilled or driven at usual
intervals along the planned excavation perimeter.
There use
is increasing day by day in modern Civil Engineering works because of certain
advantages. Different inventions are being done to improve site related issues.
No comments:
Post a Comment