Monday, September 28, 2015

Learn free Civil Engineering by Civilustaad about SPIRAL CURVES

http://civilustaad.blogspot.com/

SPIRAL CURVES

Spiral curves were initially designed for the Railroads to smooth the transition from a tangent line into simple curves. They helped to lessen the wear and tear on the tracks. Spiral curves were implemented at a soon date on highways to provide a smooth transition from the tangent line into simple curves. 





The highway engineers later determined that the majority drivers will naturally make that spiral transition with the vehicle; consequently, spiral curves are only used on highways in special cases nowadays.


Because they were used in the past and in particular cases today, we need to identify how to calculate them.




From the surveyor’s viewpoint, the design of spiral curves has previously been determined by the engineer and will be documented on existing R/W and As-built plans. 




All we have to do issue, the information shown on these plans to fit the spiral curve inside our surveyed alignment


Tuesday, September 8, 2015

Learn Free Civil Engineering by Civilustaad about Waffle mat?

http://civilustaad.blogspot.com/

What is Waffle mat?



Waffle mat is a concrete foundation forming system used on unrestrained soil and on other types of soil where larger slab rigidity is required. Waffle mat creates a outline of deep voids on the underside of concrete foundation slabs. The voids are created with Waffle boxes that are made with recycled plastic. Concrete is poured over the Waffle boxes to form the slab, and to form a chain of slim beams in two directions between the Waffle boxes. The beams have center-to-center dimensions that do not exceed 4’-2”, and that carry the foundation openly on the soil. They make a extremely rigid foundation slab.

                           

It’s significant to observe that a 4” thick concrete slab with closely spaced beams, as used in the Waffle mat foundation, is much added rigid than a 4” thick concrete slab with extensively spaced beams, as is commonly used in Texas.



It’s significant to observe that a 4” thick concrete slab with closely spaced beams, as used in the Waffle mat foundation, is much added rigid than a 4” thick concrete slab with extensively spaced beams, as is commonly used in Texas.



Note: Foundations using the Waffle mat system ought to be designed by a licensed Civil or Structural engineer skilled in the design of concrete foundations on expansive soil, using soil test information provided by a licensed Geotechnical engineer.


Learn free civil engineering by civilustaad about CIRCULAR CURVES IN SURVEYING

http://civilustaad.blogspot.com/

Learn free civil engineering by civilustaad about CIRCULAR CURVES IN SURVEYING

In the geometric intend of motorways, railways, pipelines, etc., the plan and setting out of curves is a vital aspect of the engineer’s occupation. The preliminary design is typically based on a succession of straight sections whose positions are defined mainly by the geography of the area. The intersections of pairs of straights are then linked by horizontal curves.

                              

In the vertical design, intersecting gradients are linked by curves in the vertical plane.

                                               


Circular curves are used to link intersecting straight lines (or tangents). Circular curves are implicit to be concave. Horizontal circular curves are used to transition the alter in alignment at angle points in the tangent (straight) portions of alignments. An angle point is called a point of intersection or PI station; and, the change in alignment is definite by a deflection angle, Δ.

                                  

Types of Circular Curves are:

Simple Curve
Compound Curves
Reverse Curves
Broken Back Curves